| Item | Qty | Description | Unit $ | HW Total | 3 Year | |||
| No. | HW Maint | |||||||
| 1 | 5 | The current card-reader door locks on the labs are unreliable and hard to manage. We recommend replacing them with Locknetics card-reader locks. The Locknetics locks are more flexible, and have the option of using a keypad or a UofMN key. | $1,000.00 | $5,000.00 | ||||
| 2 | 41 | The Dell computers that we moved into 2-170 and 2-172 will be 4 years old this summer and need to be replaced. | $2,500.00 | $102,500.00 | ||||
| 3 | 1 | CCTV security system for ME 308. This includes a Digital Video Recorder, 8 cameras, cable and installation | $17,000.00 | $17,000.00 | ||||
| 4 | 1 | CCTV security system for Lind 24. This includes a Digital Video Recorder, 4 cameras, cable and installation | $12,000.00 | $12,000.00 | ||||
| 5 | 1 | CCTV security system for CivE 230. This includes a Digital Video Recorder, 4 cameras, cable and installation | $12,000.00 | $12,000.00 | ||||
| 6 | 2 | We have 3 servers for IT Labs, the main server that handles mail, NIS, and file services (phb.itlabs.umn.edu), the web server ( www.itlabs.umn.edu), and a database server (db.itlabs.umn.edu). Each of these is 5 years old and the current maintenance contract will run out on 9/30/04. We recommend replacing them this summer as the cost of a maintenance contract is 65% of the cost of replacing them. The CSE department will split the cost of www.itlabs with IT Labs because one server can serve both www.cs. and www.itlabs. The servers will be Sun Fire V210s with 2 CPUs and 4 GB of RAM. This price assumes we purchase them before June 15th to get a 50% discount off list price. | $2,961.16 | $5,922.32 | $3,300.00 | This is $550 per year per server for 7x24x365 with 4hr response. | ||
| 7 | 1 | 50% of the cost of a Sunfire V210 to replace www.itlabs.umn.edu | $1,480.58 | $1,480.58 | $1,650.00 | |||
| 8 | 1 | The current RAID storage system we have on phb.itlabs is 3 1/2 years old. The vendor that sold us the RAID was bought by another company and they no longer support this RAID configuration. We have some spare parts, but the RAID controller is no longer made, so if the controller should fail, we could replace it only once. Lately the controller has been locking up and we have to reboot both the RAID and phb.itlabs to recover. For these reasons we are recommending that we get a new Gateway Serial ATA RAID system with 1 TB of storage. This comes with 4 yrs 7x24x365 4hr service contract. With this new RAID we would double the current quote from 200 MB to 400 MB for each student. | $5,500.00 | $5,500.00 | ||||
| Total | $161,402.90 | $4,950.00 | ||||||
| 9 | Conversion of ME 314 into a Dual-Purpose Lab/Classroom | |||||||
| The Mechanical Engineering Department has requested that ME 314 (which is part of the lab generally known as ME308) be converted into a classroom that can be reserved to hold classes in during the semester. This room is NOT for scheduling every class in for entire semester, but instead for use a few times a semester for special demonstrations etc. All Departments will have equal access to reservations for this room | ||||||||
| 9a | Remove electrical outlets from carrels and have new electrical outlets installed on east wall | |||||||
| Remove existing carrels and have them taken to Como Recycling | ||||||||
| Remove slate blackboards and replace with white boards | ||||||||
| Replace light fixtures and rezone the lights so the front can be turned off | ||||||||
| Add doors to opening in south wall | ||||||||
| Paint the room | ||||||||
| Misc. FM services charges | ||||||||
| Total for above work done by Facilities Management (not to exceed price) | $41,000.00 | |||||||
| 9b | Add ceiling mounted projector with speakers and amplifier, and screen | $14,500.00 | ||||||
| 9c | Clean Carpet | $200.00 | ||||||
| 9d | Reconfigure network outlet locations | $1,500.00 | ||||||
| 9d | Purchase 36 tables, 7 CPU slings, 29 CPU shelves | $10,000.00 | ||||||
| Classroom/Lab Total | $67,200.00 | |||||||